In March of 1998, we opened our ASME authorized welding division. Since that time, our welding shop has reflected the type of high quality service our customers have come to expect from Gene Watson Construction.

Our shop is authorized to have the "U" stamp for the manufacture and repair of pressure vessels, such as knockouts, separators, and absorbers. All manufactured vessels are registered with the National Board of Boiler and Pressure Vessel Inspectors. We can install man-ways, nozzles, and nipples into existing vessels. GWC Mfg.holds an ASME "U" stamp for Division 1, but is authorized Division 2 work on vessels.

GWC Mfg. is also authorized to have the "S" stamp for the manufacture and repair of Power Boilers. We have worked with all facets of Steam Generators, such as tube replacement and the complete reconstruction of the convection sections.

GWC Mfg. uses the California Division of Safety and Health: Pressure Vessel Division as our Authorized Inspector. By having the state as our A.I., our customers are assured that they are receiving the highest quality of construction possible. Our zero defects tolerance QA/QC policy assures strict adherence to exacting specifications.

Our shop has the capabilities for all types of fabrication, large or small, including stainless steel, carbon steel, and alloy metals. All fabrication work is performed to meet or exceed the industry standards regarding quality and material control. Structural work can be performed both in the field or at our shop, depending on customer preference.

GWC Mfg. and our Project Management Department work very close on all projects. The Project Management Department assist in the engineering and scheduling of projects. GWC Mfg. is committed to completing every project on schedule and within budget while maintaining Gene Watson Construction's reputation as an industry leader in quality and safe project performance. This joint effort, with our customers, assures the project will be completed in the most efficient, cost effective manner possible.